With the plans we provide, there's about a 1-2 hour learning curve for those who have never used us before. So, when your project is complete, you may pay a bit more per square foot, but you'll have a much higher level of performance and energy savings.ĥ. The cost of our product is higher, but the costs of materials, labor, installation, etc. What we've found, with much research across the country over the years, is that, worst case, Warmboard is about 10-20% more expensive overall on a completed job. If you're using a high-efficiency condensing boiler, this will really help with maximizing the performance of that system. We generally run between 80-110✯ compared to the 135+ range. Also, our water temps will (in all likelihood) be lower. ![]() ![]() In general, your finish flooring will install much more easily too, lowering that cost. If you use Warmboard-S, you'll also remove the cost of installing the subfloor in addition to installing the radiant panels. You'll use about 1/2 the amount of tubing and manifolds. If you are in a rush, we can usually get you the product in a couple of weeks.Ĥ. We help design your system (panel layout, panel count, loop lengths, manifold locations, etc.). There is a longer lead time with Warmboard. I would encourage to view those if you haven't already.ģ. We do have thermographic videos on our site showing how the products perform and how they install. ![]() Our products (Warmboard-S and Warmboard-R ) are generally considered to be the best in the industry for both installation and performance. The heating help forum has very useful information.Ģ. Hopefully we can help you with a couple of your questions, without sounding too biased.
0 Comments
Leave a Reply. |
Details
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |